ekstruzija, fleksotisak, konverzija
Your Name (required)
Your Email (required)
Subject
Your Message
T +385 40 683200 / F +385 40 683201
The new production hall in Kotoriba is finally completed. The completed hall covers an area of 2100 m², after which the total area of MURAPLAST buildings are around 10 000m². The aim of the new hall is to increase production and storage area.